Base Station 28 Mount Hamilton II outage is resolved.
A power based issue was resolved.
Posted: 8/3/2022 20:44:38
A power based issue was resolved.
Posted: 8/3/2022 20:44:38
Technicians are responding and we hope to have service restored soon to the Mount Hamilton area.
Posted: 8/3/2022 19:03:01
The repair is scheduled to begin at around 3:30pm and is expected to last no more than an hour. During the hour, some clients on base station 15 will experience an an intermittent connection.
Posted: 8/3/2022 18:54:26
We will be performing a base station switch replacement scheduled between 1:30pm-3:30pm today. The actual service interruption will be 30 minutes or less.
Posted: 7/19/2022 16:34:12
Conducting a test of outage page – 7/18
Posted: 7/18/2022 12:06:21