Network Status
Real-time status of Etheric Networks services across the Bay Area
All Systems Operational
Our network is operating normally across all Bay Area locations
Recent Updates
(Resolved)
July 7, 2025 2:10 pm
BS40 Emeryville tower is back online
Issue: No Issues At This Time
Clients in the Emeryville and surrounding area have service fully restored to include speeds. Outage is resolved.
Scheduled Maintenance
San Mateo
BS55 San Mateo – Equipment Upgrade
Start: 2024-11-22 08:00
End: 2024-11-22 16:00
11/22 8am-4pm – Customers homed on our San Mateo tower will experience brief interruptions in service or periods of slower connections while we replace the switching equipment at the tower. Work must be performed during the day due to building access constraints.
San Mateo
BS55 San Mateo – Equipment Upgrade
Start: 2024-11-22 08:00
End: 2024-11-22 16:00
11/22 8am-4pm – Customers homed on our San Mateo tower will experience brief interruptions in service or periods of slower connections while we replace the switching equipment at the tower. Work must be performed during the day due to building access constraints.
Watsonville, Gilroy, Morgan Hill
Base Station (BS20) Maintenance (10/11/2024)
Start: 2024-10-12 02:00
End: 2024-10-12 05:00
Power equipment replacement will occur on 10/12/2024 (early Saturday morning) during our Maintenance Window (2 a.m.—5 a.m.). Expected downtime is 15 minutes or less. We apologize for the inconvenience.
No maintenance events scheduled
There is currently no maintenance scheduled.
MAINTENANCE – MILPITAS BASE STATION
We will be performing work at the Milpitas base station to reinforce the structure after the past recent storms. We are not expecting any downtime but the work could result in degraded service. in Hayward / Fremont / Milpitas / San Jose.
From 9:00:00 AM on 1/25/2023 until 5:00:00 PM on 1/25/2023.
Posted: 1/19/2023 15:13:12
There is currently no planned maintenance scheduled
Planned maintenance
Start: Monday 02:00 PDT / 09:00 UTC
End: Monday 05:00 PDT / 12:00 UTC
What: Distribution Switching/Routing Software Updates
Who: Primarily customers connected to BS15 Rigoni, BS16 Wildcat Ridge, BS18 Sierra road, BS23 Finley Ridge, BS27 Blue Oaks towers
Why: Updated software to address corner case issues and performance
Impact: Connectivity may be interrupted mutliple times for up to 15 minutes at a time during the maintenance window. Posted at: 8/21/2022 15:05:40
Planned Maintenance
Start: Sunday 02:00 PDT / 09:00 UTC
End: Sunday 05:00 PDT / 12:00 UTC
What: Distribution Switching/Routing Software Updates
Who: Primarily customers connected to BS01 Black Mountain, BS06 Belmont Hill, BS10 Loma Prieta, BS12 Layer 42, BS20 Madonna towers
Why: Updated software to address corner case issues and performance
Impact: Connectivity may be interrupted mutliple times for up to 15 minutes at a time during the maintenance window. Posted at: 8/20/2022 17:58:36
Planned Maintenance on the whole network
Start: Saturday 02:00 PDT / 09:00 UTC
End: Saturday 05:00 PDT / 12:00 UTC
What: Core Switching/Routing Software Updates
Who: All customers
Why: Updated software is required on multiple switches to support a new routing architecture
Impact: Connectivity may be interrupted multiple times for up to 15 minutes at a time during the maintenance window. Posted at: 8/19/2022 15:12:02
Recent Updates
Stay Informed
For immediate support contact us:
Available 24/7